Group Assignment For point No.1 – Since the group numbers are large you should cover multiple…
Group Assignment
For point No.1 – Since the group numbers are large you should cover multiple buildings (e.g. domestic house and shop lot or
Another building)
For point No.2 – Your group assignment should cover superstructure elements (Columns, beams, ground floor slabs, staircase,
Roofs (including car porch and any extended roofs), walls (external and internal walls) and upper floors
This is group assisgment.
Subject :BUILDING TECHNOLOGY
I need a write up on the electrical connection… i have attached all the drawing and document… need to link and advise the sugesstion for electrical requirement
Group Assignment For point No.1 – Since the group numbers are large you should cover multiple…